This drawing is a sample only and is not for construction purposes. A site specific design and geotechnical testing is required for all sites. This retaining wall system is required to be designed by a suitably experienced and registered engineer (RPEQ).
No construction loads allowed within 1.5 x height of wall or 2m, whichever is greater. Hand compaction equipment to be used only.
Contact the HYBUILT team for the full cross-section diagram and engineering documentation for your project.
Shop the materials
Not sure on quantities? Use the wall calculator or request a quote and our team will confirm your list.